Project History

  • 2020

    • 08
      Started Research Project to Construction a Smart Design Platform Framework - KIER
    • 07
      Started Development of Load Test Simulation Software to Evaluate the Level of Reinforcement of Sensing Type(SMR) - KICT
    • 07
      Development of BIM based Piping and Appurtenant Design Automation System - KICT
    • 06
      2nd Development Contract for Integrated Construction Management System (Construction Space) - Hyundai Engineering
    • 05
      Integrated Bidding Management System (Proposal Space) Development Contract - Hyundai Engineering
    • 05
      Integrated Design Management System (Engineering Space) Development Contract - Hyundai Engineering
    • 04
      Construction Quality Management System Development - Lotte E&C
    • 04
      Construction of Plant Piping Joint / Spool Management System - Lotte E&C
    • 04
      Completed Construction of Plant Commissioning / PJT Termination Management System - Lotte E&C
    • 03
      Started Smart Factory Support Project (New Build, Boyoun EPC ERP, etc.) - SMCI
    • 02
      Completion of Technology Development Project : ICT Convergence Industry 4.0s (Shipbuilding & Offshore) – NIPA
  • 2019

    • 12
      Construction of SK Hynix Piping Plan Automation System - SK E&C
    • 11
      Tax Accountant Estimation and Consulting Mobile App Development - Anse Accounting Firm
    • 07
      Revit-based Piping ISO Drawing Automation System Installation (SK hynix) - SK E&C
    • 06
      Development of Platform for the Production Process to Enhance Manufacture of Outfitting of Ships and Offshore Plants - Samsung Heavy Industries
    • 06
      On-site Construction Management System Support and Maintenance Contract - Hyundai Engineering
    • 04
      MFC Project Ez-Spool Service Contract - GS E&C
    • 04
      Yeosu No.2 Complex Project Ez-Spool Service Contract - GS E&C
    • 02
      Construction of Sales Support System - HR Comms.
    • 02
      Construction of Hydraulic Calculation System - Hyundai Engineering
    • 01
      Plant Bidding Management System (Proposal Space) Construction Contract - Hyundai Engineering
  • 2018

    • 06
      Provide Piping Isometric Drawings from Revit Model (Ez-ISO) - SK E&C
    • 06
      On-site Spool Tracking System Development - Hyundai Engineering
    • 04
      Plant Civil Engineering Integrated Design System – PEDAS System Service Provided – SK E&C
    • 01
      Plant Civil Engineering Integrated Design System – PEDAS System Service Provided – Hyundai E&C
    • 01
      Development of Platform for the Production Process to Enhance Manufacture of Outfitting of Ships and Offshore Plants - Samsung Heavy Industries
    • 01
      Provide Spool Drawing Service using Ez-Spool (7th Year) - Hyundai Engineering
    • 01
      Provide Spool Drawing Service using Ez-Spool (3rd Year) - Doosan Heavy I&C
    • 01
      Provide Spool Drawing Service using Ez-Spool (4th Year) - GS E&C
  • 2017

    • 12
      Construction of Plant Integrated Welding Control System - Hyundai Engineering
    • 12
      Development of Plant On-site Material Management System – Hyundai E&C
    • 09
      Development of Platform for the Production Process to Enhance Manufacture of Outfitting of Ships and Offshore Plants - Samsung Heavy Industries
    • 06
      Construction of Piping Welding Control System - Hanwha E&C
    • 05
      Plant Civil Engineering Integrated Design System – PEDAS System Service Provided – GS E&C
    • 03
      Expansion of Plant Commissioning Management System – GS E&C
    • 01
      Provide Spool Drawing Service using Ez-Spool (6th Year) - Hyundai Engineering
    • 01
      Provide Spool Drawing Service using Ez-Spool (2nd Year) - Doosan Heavy I&C
    • 01
      Provide Spool Drawing Service using Ez-Spool (3rd Year) - GS E&C
  • 2016

    • 08
      GS E&C Developed Material Management System of Piping Spool
    • 08
      HYUNDAI ENGINEERING Developed Integrated Management System of Engineering Data
    • 03
      HYUNDAI ENGINEERING Maintained Plant Site Document Management & Collaboration System
    • 03
      HYUNDAI ENGINEERING 플Maintained Automation System of Plant Piping Spool Drawing
    • 03
      HYUNDAI ENGINEERING Maintained Electronic Approval System
    • 01
      GS E&C Maintained Plant Engineering System gTools
    • 01
      HYUNDAI ENGINEERING Developed Management System of Integrated Quantity
    • 01
      GS E&C Maintained Management System of Plant Commissioning
  • 2015

    • 12
      HuenSystem Developed Automation System of Underground Drainage Design
    • 12
      HuenSystem Developed Automation System of Civil Engineering Foundation Design
    • 12
      GS E&C Developed Instrumentation Logic Simulator System
    • 09
      GS E&C Delivered Automation System of Subsystem Markup P&ID
    • 08
      GS E&C Developed Civil Engineering Quantity Calculation System
    • 07
      GS E&C Developed Steel Material Management System
    • 05
      HuenSystem Developed Automation System of ColumnBase Design
    • 05
      HuenSystem Developed Automation System of ISO Drawing on Revit
    • 05
      Hanwha E&C Delivered System of Subsystem Markup AutoCAD P&ID
    • 05
      HuenSystem Developed Program for Plant Stationery Site & Quantity Calculation
    • 03
      Doosan Heavy I&C Delivered Automation System of Plant Piping Spool Drawing
    • 01
      Daewoo E&C Delivered Commissioning Management System
  • 2014

    • 12
      HuenSystem Developed Automation System of Plant Piping Spool Drawing
    • 12
      ILSHIN SECURITY Developed System of Monitoring Access Control
    • 12
      GS E&C Developed Automation System of Intrumentation Level Sketch
    • 03
      HuenSystem Developed System of Civil Engineering Quantity Calculation
    • 03
      GS E&C Developed System of Civil Engineering & Construction Quantity Calculation
    • 02
      HYUNDAI ENGINEERING Developed System of Piping Quantity Calculation
    • 02
      HYUNDAI ENGINEERING Developed Management System of Technical Specification Document
    • 02
      HYUNDAI ENGINEERING Developed Management System of Integrated Calculation Document
  • 2013

    • 10
      Daewoo E&C Developed Integrated Management System of Plant Construction / Construction / Structure Estimating Quantity at 2nd year
    • 09
      Seoul Metropolitan Government Released Mobile App for Multicultural Families and Foreigners in Seoul
    • 09
      Samsung Engineering Sold System Package to Convert 3D Steel Data(Including Revision Function)
    • 09
      HuenSystem Developed Automation System Package of Structural Calculation / Drawing / Estimation for Plant Civil Engineering / Construction
    • 09
      HuenSystem Developed Automation System Package of Plant Civil Engineering Underground Pit Design
    • 09
      HuenSystem Developed Automation System Package of Plant Civil Engineering Foundation Design
    • 08
      HYUNDAI ENGINEERING Supported to Improve the Performance of Management System of Plant Construction / Commissioning
    • 06
      HYUNDAI ENGINEERING Developed Plant Site Document Management & Collaboration System
    • 03
      HYUNDAI ENGINEERING Developed Plant Piping Spool Drawing Automation System
    • 03
      HYUNDAI ENGINEERING Developed Expansion of Electronic Approval System
    • 01
      GS E&C Maintained Plant Engineering System gTools
    • 01
      HYUNDAI ENGINEERING Developed Enterprise IT Asset Management System
    • 01
      Hyundai E&C Developed Plant Construction Processing Management System
  • 2012

    • 10
      HYUNDAI ENGINEERING Developed Enterprise IT Asset Management System
    • 10
      Seoul Metropolitan Government Developed Mobile App for Multicultural Families and Foreigners in Seoul
    • 09
      Daewoo E&C Developed Integrated Management System of Plant Construction Estimating Quantity
    • 09
      SAMSUNG C&T Developed Plant Construction 4D System
    • 08
      Daewoo E&C Sold Steelhub(Program to Convert Steel Data)
    • 07
      KCC E&C 2nd Developed Plant Piping Material Estimation System
    • 05
      GS E&C Developed EPC Data Portal System
    • 05
      GS E&C Developed Piping Workfront Forecast Management System
    • 05
      GS E&C Developed Enterprise Organization Chart Management System
    • 05
      GS E&C Developed Enterprise Process Chart Management System
    • 03
      HYUNDAI ENGINEERING Maintained Plant Construction / Commissioning / Engineering System
    • 01
      Daewoo E&C Developed Plant Piping Material Estimation System
  • 2011

    • 10
      The Korea Association of Information Systems Audit Developed Integrated Operation System for Supervisors and Association Management
    • 08
      KCC E&C Developed Estimation System of Plant Pipint Materials
    • 05
      GS E&C Maintained gTools System
    • 04
      HYUNDAI ENGINEERING Sold SteelHub(Steel Data Conversion Program)
    • 03
      HYUNDAI ENGINEERING Developed PSIM(Commissioning Subsystem Definition) at 2nd Year
    • 03
      Doosan Heavy I&C Developed Estimation System of Plant Piping Materials
    • 02
      HYUNDAI ENGINEERING Redeveloped Automation System of Plant Civil Engineering & Construction Foundation Design at 2nd Year
    • 02
      HYUNDAI ENGINEERING Expanded Plant Commissioning Management(HCQM) System & Developed Work Flow Function at 3rd Year
    • 02
      HYUNDAI ENGINEERING Developed System Expansion of Electronic Approval on Mobile
  • 2010

    • 12
      SK E&C Sold SteelHub(Steel Data Conversion Program)
    • 09
      GS E&C Developed Tools System of Plant Engineering Design
      - Stream Date Management System
      - Hydraulic Calculation System
      - Pipe Line List Management System
    • 05
      Daelim Industrial/Hyundai Heavy Industries/Samsung Engineering Sold SteelHub(Steel Data Conversion Program)
    • 04
      HYUNDAI ENGINEERING Redeveloped Automation System of Plant Civil Engineering & Construction Foundation Design
    • 03
      HYUNDAI ENGINEERING Supported Application of SPPID 2D Design System
    • 03
      HYUNDAI ENGINEERING Developed Electronic Approval Expansion at 3rd Year
    • 03
      HYUNDAI ENGINEERING Redeveloped System of Plant Civil Engineering Quantity Calculation
    • 02
      Korea Electric Power Corporation/DarinSystem Developed Central SCADA PNA DB Sync System & PIT Test Evaluation Tool
    • 02
      HYUNDAI ENGINEERING Developed Expansion of Business Information System
    • 02
      HuenSystem Certified Korean Venture Company
    • 01
      HuenSystem Patent Registration of SteelHub
  • 2009

    • 11
      The Korea Association of Information Systems Audit Developed Website
    • 09
      HuenSystem Established HuenSystem Research Institute
    • 06
      HYUNDAI ENGINEERING Developed Management System of Integrated Commissioning
    • 05
      HYUNDAI ENGINEERING Developed PSIM
    • 05
      SK E&C Developed System of Building Information Modeling(BIM)
    • 04
      HYUNDAI ENGINEERING Upgraded Management System of Plant Commissioning
    • 03
      HYUNDAI ENGINEERING Developed Expansion of Electronic Approval at 2nd Year
    • 02
      HYUNDAI ENGINEERING Supported Application of Business & Admin for 3D System
  • 2008

    • 12
      Kyeam Technologies Developed System of Engineering Utility(Nesting)
    • 12
      HYUNDAI ENGINEERING Developed System of New Electronic Approval
    • 09
      HYUNDAI ENGINEERING Developed Integrated Management System of Power Plant Cycle Design(Heat Balance Manager)
    • 07
      Toyo Japan/Toyo Korea Sold SteelHub(Steel Data Conversion Program)
    • 07
      MSA Certification Developed Utility of ISO Certification Task
    • 06
      Samsung Engineering/Hanwha E&C Sold SteelHub(Steel Data Conversion Program)
    • 06
      GS E&C/Daewoo E&C Sold SteelHub(Steel Data Conversion Program)
    • 06
      Hanwha E&C Developed Management System of Plant Pipe Line Data
    • 06
      Kyeam Technologies Maintained System of Management Information at Kyeam Technologies
    • 04
      HuenSystem Office Movement to C-407, 168, Gasan digital 1-ro, Geumcheon-gu
    • 03
      HuenSystem Starting SteelHub Sale, Trademark Registration & Patent Application
    • 03
      HuenSystem Maintained Management System of Plant Commissioning
    • 01
      HuenSystem Established HuenSystem
  • 2007

    • 12
      HYUNDAI ENGINEERING Developed System of Plant Integrated Quantity
    • 12
      GS E&C Developed System of Covil Engineering Underground Design
    • 09
      HYUNDAI ENGINEERING Developed System of Tidal Power Generation Simulation
    • 09
      HYUNDAI ENGINEERING Developed Management System of Project Performance
    • 06
      HYUNDAI ENGINEERING Developed Automation Solution of SP P&ID
    • 04
      MSA Certification Developed Management System of ISO Certification Task
    • 04
      Kyeam Technologies Developed Task Management System
  • 2006

    • 12
      CPENC Developed Prediction System of Sewer Pipes Corrosion
    • 12
      HYUNDAI ENGINEERING Developed System of Plant Civil Engineering BOQ(Estimation Quantity)
    • 11
      HYUNDAI ENGINEERING Developed Management System of Commissioning
    • 08
      HuenSystem Established Huen Information Process Technology Office