Projects 목록
Project Name Type Discipline Description
Hydraulic Calculation engineering process As Hydraulic Data Management System in the plant process, it models directly the Circuit Diagram without 2D modeling program such as ZYQAD, AutoCAD, etc. by loading Graphic engine in this system, and performs Hydraulic Calculation.
4D System(3D Model/Process System Linkage) construction process It is the system that generates, simulates and manages 3D models combining 3D objects (SP 3D) and WBS (Primavera). After it uses activity information of Primavera as WBS information and SmartPlant 3D system structure and links 3D+Primavera data, it links and utilizes data needed for review, then reviewed information is resent to Primavera.
Workfront Management System construction process It is the system to calculate workfront, one of the main management index of piping construction by main piping information (BM, delivery schedule, weld joint information) from design, purchase and construction.
EPC Data Portal System process It is the system for easy selecting and referencing of engineering data, document, 2D drawing, 3D object, etc. as Item Tag at EPC stage when a plant project is executed. * Main Data : Item Tag, 2D Drawing, 3D Drawing, Project Document, etc.
Stream Data Management engineering process The system is Stream Data Management System in the field of Plant Process. It is handy to use Process Data Revision Management due to simplify the work process of Stream Data Production and Management.